Installation – Elmo Rietschle L-BV5 Operating instructions User Manual

Page 17

Advertising
background image

Installation

© Gardner Denver Deutschland GmbH

17 / 32

610.44440.40.000

5.2.3 Connecting up system components

 Connect up the components in accordance

with the flow diagram shown below:

Operation with supply of the operating-liquid,
automatically controlled operation

1

2

3

4

5

6

7

610.44440.99.B09

1 Unit
2 Flow

meter

3 Throttle

valve

4 Solenoid valve coupled to the motor
5 Bypass line with shut-off valve (for initial filling)
6 Strainer
7 Operating-liquid

supply

line

Fig. 8: Operation with supply of the operating-

liquid: automatically controlled operation

Operation with supply of the operating-liquid,
non-automatic control of operation

1

2

3

4

6

7

610.44440.99.B10

1 Unit
2 Flow

meter

3 Throttle

valve

4 Shut-off

valve

6 Strainer
7 Operating-liquid

supply

line

Fig. 9: Operation with supply of the operating-

liquid: non-automatic control of operation

Operation with self-suction of the operating-
liquid

900 mbar abs

13.1 psia

≤ 1 m

≤ 3.28 ft

4

a

b

1

7

9

8

610.44440.99.B11

1 Unit
4 Shut-off

valve

7 Operating-liquid

supply

line

8 Suction

line

9 Operating-liquid storage vessel
a Liquid level necessary on start-up
b Min. liquid level during operation

Fig. 10: Operation with self-suction of the operat-

ing-liquid


5.2.4 Ancillaries

The following ancillaries can be supplied from our
catalogue:

 liquid separator including return line and cavi-

tation-protection line

 cavitation-protection

valve

 check

valve

 connection and contra-flanges

 gas

ejector

 flow

limiter.






















Advertising
This manual is related to the following products: