Commissioning

610.44440.40.000

20 / 32

© Gardner Denver Deutschland GmbH

 Take measures to ensure that the unit

CANNOT be operated with the shut-off device
closed.

 Measure the motor insulation resistance.

At values ≤ 1kΩ / Volt of measurement poten-
tial, dry the windings.

 Check the piping / hose connections for leaks.

6.2

Start-up of unit with operating-liquid
supply

Filling up with operating-liquid

For operation with supply of the operating-liquid,
now fill the unit's operating chamber with operat-
ing-liquid.

 For automatically controlled operation:

the shut-off valve in the bypass line (item 5,
Fig. 8, page 17) is to be opened for approx.
20 s.

 For non-automatic control of operation:

the shut-off valve (item 5, Fig. 9, page 17) is
to be opened for approx. 20 s.

Setting the initial pressure of the operating-
liquid

 The initial pressure, p

A

in operating-liquid

supply line (item B, Fig. 11, page20) is to be
set at approx. 1 bar [14.5 psi] above the suc-
tion pressure, p

B

in the suction line (item A,

Fig. 11, page20).

B

A

pB = pA + 1 bar

pB = pA + 14.5 psi

610.44440.99.B14

A Suction line
B Operating-liquid supply line

Fig. 13: Adjusting the operating-liquid flow-rate:

setting the initial pressure

Further steps at start-up are identical to the pro-
cedures during operation.



6.3

Start-up of unit with self-suction of op-
erating-liquid

Fill up with operating-liquid

Units with self-suction of operating-liquid are filled
with operating-liquid before completion of the
installation (Filling up with operating-liquid,
page 15.

Further steps at start-up are identical to the pro-
cedures during operation.

6.4

Checking the direction of rotation

 Check the piping / hose connections on the

suction and discharge connections.

 The unit may not run dry!

See the section, "Filling up with operating-
liquid", page 15 and page 20.

 Briefly switch the unit on then off again.

 The intended direction of shaft rotation is

marked by an arrow (item 9 page 3) on the
pump casing.

 Before shutting the unit down compare the

actual direction of rotation of the external fan
with the intended direction of rotation of the
shaft.

 If necessary, reverse the direction of rotation

of the motor.