8 commissioning, Warning, Caution – Elmo Rietschle L-BV7 User Manual

Page 28: Notice

Advertising
background image


610.48060.40.000

28 / 64

© Gardner Denver Deutschland GmbH

Commissioning

8 Commissioning

WARNING

Danger due to gauge pressure
and vacuum!

Danger due to escaping fluid!

Danger due to rotating parts!

The pump-motor unit may only
be put into operation when the
following conditions are met:
 Fan guard and vacuum

pump/compressor housing
are mounted.

 The lines to the discharge

connection, inlet connection
and operating-liquid port are
attached.

 The lines and connections

have been tested for strength
and leaks.

CAUTION

If the unit is run dry, the
mechanical seal will be
destroyed in a matter of seconds!

DO NOT switch on as long as the
unit is not filled with operating
liquid!


8.1 Preparation

and

start-up

CAUTION

If the pumped gases/vapors
discharged on the pressure side
are passed on,
then it must be ensured that the
maximum discharge pressure of
1.1 bar abs. [16.0 psia] is not
exceeded!

NOTICE

Maximum permissible quantity of
water entrained via the inlet
connection:
See Fig. 13, Pg. 32.



If a shut-off device is installed in the discharge
pipe:
Make sure that the unit CANNOT be operated
with the shut-off device closed.


Fill with operating liquid:

When and how the pump-motor unit must be
filled with operating liquid the first time is
dependent on the operating mode:

 For self-priming operation:

During installation.

 For operation with operating-liquid feed:

After completing installation.


For operation with operating-liquid feed,
you now fill the working area of the unit with
operating liquid.
To do this, open the respective stop valve for
approx. 20 sec.:

 For non-automatic operation:

Stop valve (Fig. 11, Pg. 32, Item 4).

 For automatic operation:

Stop valve in the bypass pipe (Fig. 12,
Pg. 32, Item 4a).



Then proceed with commissioning as
described in the following.







Advertising