Transportation and Storage

3.1 Packaging

The enclosure and components are shipped on individual pallets and shrink wrapped. The pallet is approximately
0.13m H x 1.07m W x 1.07m D (5” H x 42” W x 42” D) and the overall height including pallet and enclosure is
approximately 1.1m (43”). The enclosures and components cannot be stacked.

NOTE: Packaging assemblies and methods are tested to International Safe Transit Association standards.

WARNING
Never transport the unit with batteries installed.

Batteries must ONLY be installed after the unit is transported to the site and secured to the pad.
Transporting the unit with batteries installed may cause a short circuit, fire, explosion, and/or
damage to the battery pack, enclosure and installed equipment. Damage caused by improper
shipping or transporting a unit with batteries installed is not covered by the warranty.

The batteries used in this application may vary slightly depending upon optional configurations, battery types, or
customer requirements. The batteries are typically valve-regulated such as the Alpha Cell. Should a battery be
found damaged, refer to the battery manufacturer's documentation regarding the safe handling of the battery.

3.2 Storage

The weight of the enclosure is listed in the specifications. The equipment pallet can be moved using a forklift.

Do not hoist/lift enclosure with batteries installed.

If the batteries are installed, the warehouse facility may have to be certified for handling such goods. Typically, the
batteries will be on a separate pallet; the same requirements for certification will apply.

3.3

Site Considerations (see Section 4)

It is assumed that the site will be ready for enclosure installation upon arrival. Two able-bodied persons will be
required at the site to lift and place the enclosure and components. The Installation team must assess the
transport path for all obstructions. Use safe lifting practices.

3.4 Inspection

Prior to unpacking the equipment, perform a visual inspection and note any damage. Unpack the equipment and
inspect the exterior for damage. If any damage is observed contact the carrier immediately.

Continue the inspection for any internal damage. In the unlikely event of internal damage, please inform the
carrier and contact Argus Technologies for advice on the consequence of any damage.

Verify that you have all the necessary parts per your order for proper assembly.

Call Argus Technologies if you have any questions before you proceed: 1 (888) 462-7487