Figure 4–MBS/PD panel and packing list

1) 2*23” mounting brackets

2) 5 *inter-connection bus bars

3) 4*M6 screws for brackets

4) 12*M6 screws for bus bar.

Continue the inspection for any internal damage. In the unlikely event of internal damage, please inform the
carrier and contact Argus Technologies for advice on the consequence of any damage.

Verify that you have all the necessary parts per your order for proper assembly.

Call Argus Technologies if you have any questions before you proceed: 1 (888) 462-7487
Customers outside Canada and the USA, call +1-604-436-5547 for technical support.

2.3

Handling and Storage

If the STS module is going to be stored prior to installation, it should be stored in a cool, dry, well-ventilated
location where the rain, splashing water, chemical agents, etc. will not reach based on the environment
specification standard. The equipment should be covered with a tarpaulin or plastic wrapper to protect it against
dust, dirt, paint, or other materials.

The equipment can be lifted from the front panel by drawing out the handle. Firstly, screw off the steel bolt, then
drawing out the handle until the whole module out. When the STS module has to be installed in the shelf, the bolt
should be screwed down.