Installation, Regulations governing installation, 4 installation – DE DIETRICH NEO 2.1 User Manual

Page 11: 1 regulations governing installation

Advertising
background image

4 Installation

4.1

Regulations governing installation

CAUTION

The installation must be equipped with a protective plastic

film (roof underlay film).

CAUTION

4

The installation must comply in all matters to the

standards and rules which govern the work and

interventions in individual and collective homes, and

other constructions.

4

The installation and maintenance of the appliance

must be carried out by a qualified professional in

compliance with the statutory texts of the codes of

conduct in force.

4

Before installation, make sure that the framework is

solid and strong enough to comply with the static

requirements.

4

Solar installations must be earthed to protect them

against lightning.

4

Protection of the environment: Place a container of

sufficient volume under the drain pipe and the valve

discharge pipe.

4

The roof mounting pack makes it possible to install

the solar collectors on roofs with structures

presenting a minimum incline of 17°.

4

The roof-integral installation set is designed specifically as a

mounting system for the NEO 2.1 flat solar panels and may only

be used in accordance with their building regulations approval.

4

The mounting kit is designed for roof coverings in standard

mechanical roman roof tiles for the South of France.

4

The water drainage channels on the membrane should run into

the eaves (roof gutter).

4

The installation should therefore not be flushed or filled when the

collectors are hot (in strong sunshine).

4

The solar system must at all times be filled with heat transporting

fluid.

M001788-A

M002132-A

NEO 2.1 / SUN 211

4. Installation

20/02/2013 - 300024195-001-02

10

Advertising