5 Commissioning

5.1

Check points before commissioning

4

Check the solar collectors and their fastenings.

4

Fill the installation with water and check hydraulic tightness.

4

Check the pressure of the installation.

4

Check the electrical connections, particularly the earth.

4

Check that the sensors are correctly positioned.

4

Check that the sensors are operating correctly.

4

Check and ensure that the sensor and 230 V cables are

separated.

5.2

Commissioning

Commissioning the solar circuit:
¼See solar hot water calorifier instructions

See the instructions supplied with the solar control unit and any

remote control unit used.

NEO 2.1 / SUN 211

5. Commissioning

20/02/2013 - 300024195-001-02