5 Commissioning
5.1
Check points before commissioning
4
Check the solar collectors and their fastenings.
4
Fill the installation with water and check hydraulic tightness.
4
Check the pressure of the installation.
4
Check the electrical connections, particularly the earth.
4
Check that the sensors are correctly positioned.
4
Check that the sensors are operating correctly.
4
Check and ensure that the sensor and 230 V cables are
separated.
5.2
Commissioning
Commissioning the solar circuit:
¼See solar hot water calorifier instructions
See the instructions supplied with the solar control unit and any
remote control unit used.