Installation & Start-Up Checklist

Use this form to record initial system hardware, site conditions, and controller programming information.

Retain a copy for future reference.

Fill in the appropriate data (if available).

Checklist data should be collected and logged on this form for each system installed.

Start-up Data:

Installation Date: ___________________________
Installer: _________________________________
Installation Site: ___________________________
Application: _______________________________
System Model/Serial Number: ______________
Water Source: ___________________________
Water Analysis:

Turbidity: _____________________________

Total Iron: _____________________________

Water Temperature: _____________________

System Inlet Pressure (if available): ________

System Outlet Pressure: (if available):_______

Flow Rate During Pressure Reads: _________

Chlorine: _____________________________

Pretreatment Installed: ______________________
Back-flush Kit Installed: Yes ________ No _______
Set Volume Between Flushes: ____________
Set Flushing Duration: __________________
Set Day Override: __________________________
Initial Product Water Flow Rate: _______________

_________________________________________
Other Program Details: ______________________
_________________________________________
General Notes:
_________________________________________
_________________________________________
_________________________________________
_________________________________________
_________________________________________
_________________________________________

Checklist of Installation/Start-Up Steps

Installation location allows access to membrane ___
Mounting provision accommodates system weight ___
Listed components/fittings present ___
Loose components assembled to system ___
System securely mounted ___
Solenoid valve/flow meter signal connections ___
Plumbing connections completed ___
Initial flush w/o leaks ___
Electrical power connected ___
System sanitized ___
Back-up battery installed in controller ___
Controller display okay ___
Time of day set ___
All programming steps completed ___
Proper operation verified ___
Installation/Set-Up information entered onto form ___

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

Specific Installation Notes

(Problems/Suggestions/Comments):

_________________________________________
_________________________________________
_________________________________________
_________________________________________
_________________________________________
_________________________________________

Advertising