Operation, Ontrols, Ower – Hydrotech Precision-PWS 8-M_8-MST OWNERS GUIDE User Manual
Page 23: Verheat, Eset, Controls
![background image](/manuals/332393/23/background.png)
Operation
NOTE: Read all parts of the Owners Guide before operating the
water distiller. Follow the Before Initial Water Distiller Operation
steps and be sure to complete a Steam Sterilization of the Water
Distiller Head, Filter Canister and Optional Storage Tank (if
purchased) before distilling water for household use for the first
time or after a period of storage or non-use.
Controls
COOLING FAN
INDICATOR LIGHT
HEATING ELEMENT
INDICATOR LIGHT
P
O
W
E
R
O
N
I
N
D
IC
A
T
O
R
L
IG
H
T
S
ON
OFF
(A)
(B)
(C)
Operation Switches Diagram
Refer to the Operation Switches Diagram above. There are two grey
power switches (A&B) and one overheat manual reset switch (C) on the front of
the water distiller head that allow you to control all functions of the water distiller
23