Efore, Nitial, Ater – Hydrotech Precision-PWS 8-M_8-MST OWNERS GUIDE User Manual

Page 25: Istiller, Peration, Ormal, Before initial water distiller operation, Normal operation

Advertising
background image


Before Initial Water Distiller Operation

Perform steam sterilization on the water distiller head, filter canister and
optional storage tank as described in the Maintenance and Cleaning section.

operly

Normal Operation

1.

Remove the lid from the Boiling Tank and ensure the drain is closed by
turning the drain faucet fully clockwise.

2.

See the Boiling Tank Water Level Fill Pin Diagram below. Fill the
boiling tank with water until the water reaches the bottom of the water
gauge pin.

BOILER FLOAT

WATER GAUGE

PIN

INSIDE BOILER

HEATING

ELEMENT

WATER LEVEL

IMPURITIES DRAIN

OUTLET

Boiling Tank Water Level Fill Pin Diagram




NOTE: Do not overfill the boiling tank, this will cause the raw water to enter
the cooling coil and into your container or optional storage tank.

3.

Replace the lid back onto the boiling tank and tighten. The lid must be
snug, but do not over tighten.

4.

Turn the Power and Fan switches to the ON position.

5.

Your water will now distil into the optional storage tank or a container of
your choice. The distiller will shut down automatically when the water
level is just above the heating element in the boiling tank.

25

Advertising