1 power connections, Installation 3.8.1 power connections – Hach-Lange CL17 USER MANUAL User Manual

Page 21

Advertising
background image

19

Installation

3.8.1

Power connections

DANGER
Electrocution hazard. Only qualified personnel should conduct the tasks described
in this section of the manual. Connect equipment in accordance with national,
state and local electrical codes.

Power connections are made at the terminal strip located in the left side of the electrical
compartment and are accessible when the customer access cover is opened. Refer to

Figure 9

and

Figure 12

.

For process or industrial applications, the national electrical codes of most countries
require that AC service feeds be hard-wired and contained in conduit systems. The CL17
Chlorine Analyzer has been designed to conform to this requirement.

Conduit is recommended for two reasons:

1. It is generally required by most local electrical codes.

2. Use of metal conduit can improve immunity to lightning surges and

AC power transients.

Figure 9 Locating and removing customer access cover

1

Customer access cover

2

Use a torx-driver to remove the two screws that hold the
Customer Access Cover in place. Set cover aside.

Advertising