Installation, Disconnect power from probe – Hach-Lange SC 100 User Manual

Page 25

Advertising
background image

Installation

Connecting/Wiring the sc Sensor

21

4. Strip the insulation on the cable back 1-inch. Strip ¼-inch of each individual wire end.

5. Pass the cable through conduit and a conduit hub or a strain relief fitting and an available

access hole in the controller enclosure. Tighten the fitting.

6. Wire as shown in

Table 5

.

7. Close and secure the cover.

Figure 19

Hard-wiring the sensor

Table 5 Wiring the Sensor at Terminal Block J5

Terminal Number

Terminal Designation

Wire Color

1

Data (+)

Blue

2

Data (–)

White

3

Service Request

No Connection

4

+12 V dc

Brown

5

Circuit Common

Black

6

Shield

Shield (grey wire in existing quick disconnect fitting)

1

1

+ DATA

+ DATA

+ OUT 2

+ OUT 2

– DATA

– OUT 2

SERVICE REQUEST

SHIELD/CHASSIS GND

+ V

+ V

+ OUT 1

+ OUT 1

GND

– OUT 1

2

2

3

3

4

4

5

5

6

PROBES

ANAL

OG OUTP

UTS

ANAL

OG OUTP

UTS

PCB

CONNECTOR

PCB

CONNECTOR

FIELD WIRING

INSULATION MUST

BE RATED TO

80° C MINIMUM

FIELD WIRING

INSULATION MUST

BE RATED TO

80° C MINIMUM

DANGER - EXPLOSION HAZARD

DANGER - RISQUE D'EXPLOSION

DO NOT DISCONNECT WHILE CIRCUIT IS LIVE

UNLESS AREA IS KNOWN TO BE NON-HAZARDOUS.

NE PAS DEBRANCHER TANT QUE LE EST SOUS

TENSION, A MONIS QU'IL NE S'AGISSE D'UN

EMPLACEMENT NON-DANGEROUX

NC

NC

NC

COM

COM

COM

NO

F1

F2

NO

NO

RELAY 3

RELAY 2

RELAY 1

1

1

+ DATA

+ DATA

+ OUT 2

+ OUT 2

– DATA

– OUT 2

SERVICE REQUEST

SHIELD/CHASSIS GND

+ V

+ V

+ OUT 1

+ OUT 1

GND

– OUT 1

2

2

3

3

4

4

5

5

6

PROBES

ANAL

OG OUTP

UTS

ANAL

OG OUTP

UTS

PCB

CONNECTOR

PCB

CONNECTOR

FIELD WIRING

INSULATION MUST

BE RATED TO

80° C MINIMUM

FIELD WIRING

INSULATION MUST

BE RATED TO

80° C MINIMUM

J1

J2

J4

NETWORK

INTERFACE

CARD

J3

U5

U9

S1

DANGER - EXPLOSION HAZARD

DANGER - RISQUE D'EXPLOSION

DO NOT DISCONNECT WHILE CIRCUIT IS LIVE

UNLESS AREA IS KNOWN TO BE NON-HAZARDOUS.

NE PAS DEBRANCHER TANT QUE LE EST SOUS

TENSION, A MONIS QU'IL NE S'AGISSE D'UN

EMPLACEMENT NON-DANGEROUX

1

1

+ DATA

+ DATA

+ OUT 2

+ OUT 2

– DATA

– OUT 2

SERVICE REQUEST

SHIELD/CHASSIS GND

+ V

+ V

+ OUT 1

+ OUT 1

GND

– OUT 1

2

2

3

3

4

4

5

5

6

PROBES

ANAL

OG OUTP

UTS

ANAL

OG OUTP

UTS

PCB

CONNECTOR

PCB

CONNECTOR

FIELD WIRING

INSULATION MUST

BE RATED TO

80° C MINIMUM

FIELD WIRING

INSULATION MUST

BE RATED TO

80° C MINIMUM

DANGER - EXPLOSION HAZARD

DANGER - RISQUE D'EXPLOSION

DO NOT DISCONNECT WHILE CIRCUIT IS LIVE

UNLESS AREA IS KNOWN TO BE NON-HAZARDOUS.

NE PAS DEBRANCHER TANT QUE LE EST SOUS

TENSION, A MONIS QU'IL NE S'AGISSE D'UN

EMPLACEMENT NON-DANGEROUX

NC

NC

NC

COM

COM

COM

NO

F1

F2

NO

NO

RELAY 3

RELAY 2

RELAY 1

1

1

+ DATA

+ DATA

+ OUT 2

+ OUT 2

– DATA

– OUT 2

SERVICE REQUEST

SHIELD/CHASSIS GND

+ V

+ V

+ OUT 1

+ OUT 1

GND

– OUT 1

2

2

3

3

4

4

5

5

6

PROBES

ANAL

OG OUTP

UTS

ANAL

OG OUTP

UTS

PCB

CONNECTOR

PCB

CONNECTOR

FIELD WIRING

INSULATION MUST

BE RATED TO

80° C MINIMUM

FIELD WIRING

INSULATION MUST

BE RATED TO

80° C MINIMUM

J1

J2

J4

NETWORK

INTERFACE

CARD

J3

U5

U9

S1

DANGER - EXPLOSION HAZARD

DANGER - RISQUE D'EXPLOSION

DO NOT DISCONNECT WHILE CIRCUIT IS LIVE

UNLESS AREA IS KNOWN TO BE NON-HAZARDOUS.

NE PAS DEBRANCHER TANT QUE LE EST SOUS

TENSION, A MONIS QU'IL NE S'AGISSE D'UN

EMPLACEMENT NON-DANGEROUX

J6

J5

J5

J5

J5

Disconnect
Power

From Probe

Advertising