Parameterization and operation

2-channel closed-loop control

CONFIGURE

SELECT SENSOR

Select the sensors installed for the closed-loop control (see

Section 4.4, page 29

).

CLOSED-LOOP

CHANNEL 1

SETPOINT PO4-P

Desired orthophosphate value in effluent (refer to

4.5.1, page 31

) [mg/L]

GAIN P CONTR.

Proportional gain of the closed-loop control (refer to

4.5.5, page 32

)

INTEGRALTIME

Integral time of closed-loop control (refer to

4.5.5, page 32

)

[min]

DERIVATIVE TIME

Derivative time of closed-loop control (refer to

4.5.5, page 32

)

[min]

MIN DOS RATE

Minimum flow rate of dosing pump

[L/h]

PRESELECT PROG

Programs 1 to 4 (refer to

4.1, page 15

)

CHANNEL 2

SETPOINT PO4-P

Desired orthophosphate value in effluent (refer to

4.5.1, page 31

) [mg/L]

GAIN P CONTR.

Proportional gain of the closed-loop control (refer to

4.5.5, page 32

)

[%]

INTEGRALTIME

Integral time of closed-loop control (refer to

4.5.5, page 32

)

[%]

DERIVATIVE TIME

Derivative time of closed-loop control (refer to

4.5.5, page 32

)

MIN DOS RATE

Minimum flow rate of dosing pump

[L/h]

PRESELECT PROG

Programs 1 to 4 (refer to

4.1, page 15

)

PROFILE

Active

when a measurement signal fails

Q-PROFILE

Daily profiles (2 h average) of waste water influent according to feed measurement
signal

[m³/h]

DIST PROFILE

Percentage distribution of flow rate; input refers to channel 1.

[%]

P-PROFILE

Daily profiles of PO

4

-P concentrations, 2 h average (see

4.5.4, page 32

) [mg/L]

WEEK PROFILE

Percentage daily averages of the phosphate load (refer to

4.5.4, page 32

) [%]