Hach-Lange TITRALAB Users Guide User Manual

Page 31

Advertising
background image

Introduction

31

a. Connect/install the electrode(s)

Connect/install electrodes and temperature sensors, Refer to
chapter 3.

b. Install reagents(s)

Check that the burette is installed, if not, the Titration Manager
will automatically guide you to the Install burette procedure.
Press 3 to start. Refer to Short Form Reminder no. 2.

c. Calibrate electrode(s)

Run the electrode calibration, refer to chapter 4.

d. Calibrate reagent(s) or Enter titre

Run the reagent calibration, refer to Short Form Reminder
no. 5 or enter the titre manually.

e. Run the method or the sequence, when Sunny icons are

displayed,

Refer to Short Form Reminder no. 6 and 7.

Advertising