Installation, The fulton companies 2013, Figure 13 - wall penetration details – Fulton Vantage (VTG) Fully Condensing Hydronic Boiler User Manual

Page 30

Advertising
background image

© The Fulton Companies 2013

INSTALLATION

VTG-IOM-2013-0815

SECTION 2

2-24

FIGURE 13 - WALL PENETRATION DETAILS

EXHAUST

VANTAGE

HYDRONIC

BOILER

RISE TO RUN: 1/4" PER FOOT

COMBUSTIBLE WALL

PENETRATION DETAIL

NON-COMBUSTIBLE

WALL PENETRATION

PARTIAL DETAIL

STAINLESS STEEL
HIGH TEMPERATURE
EXHAUST PIPE & FITTINGS

INSTALL SUPPORT STRAP AT

5 FT / 150 CM HORIZONTAL

INTERVALS AND AT

INTERMEDIATE ELBOWS

(SPRING HANGERS ARE

RECOMMENDED)

10" PVC PIPE (U.S. ONLY)

REQUIRED AIR

SPACE CLEARANCE

COMBUSTIBLE WALL

WALL TERMINATION

( WITH SCREEN )

6 IN. / 15 CM

MIN. / MAX. WALL THICKNESS

( 3 1/4 IN. - 20 IN. )

( 8.255 CM - 50.8 CM )

DO NOT PLACE INSULATION IN

REQUIRED AIR SPACE CLEARANCE

BAND SUPPORT

COLLAR

(TYP EACH SIDE)

TERMINATION

SCREENED

( WITH SCREEN )

TERMINATION

1/4" TAPPING FOR WATER

100 PSI MAXIMUM (U.S. ONLY)

90° PVC ELBOW

SCREENED AIR INLET

WALL

EXHAUST PIPE

WALL PENETRATION

48 IN. / 122 CM.

36 IN. / 91 CM.

(MINIMUM)

AIR INTAKE

WALL PENETRATION

LOCATE INTAKE

UPWIND OF

EXHAUST PIPING

AIR INTAKE & EXHAUST PIPES WALL PENETRATION CLEARANCES

CAUTION:
AIR INTAKE AND EXHAUST TERMINATION SHOULD BE
SEPARATED AS FAR AS POSSIBLE TO PREVENT FLUE GAS
RECIRCULATION DURING DIFFERENT WIND CONDITIONS

AIR INLET

4 FT / 122 CM ( MINIMUM )
BETWEEN INLET & EXHAUST
OPENING ( SEE BELOW )

AIR INTAKE AND EXHAUST
TERMINATION SHOULD BE
SEPERATED AS FAR AS
POSSIBLE TO PREVENT FLUE
GAS RECIRCULATION DURING
DIFFERENT WIND CONDITIONS.

OPENING 1 FT / 30 CM ( MIN )
ABOVE NORMALLY EXPECTED
SNOW ACCUMULATION LEVEL

OPENING 1 FT / 30 CM ( MIN )
ABOVE NORMALLY EXPECTED
SNOW ACCUMULATION LEVEL

PVC

90° ELBOW

(2.12 cm/m)

Advertising