3 rack and cabinet installation, Figure 4-21: panel mounting clamp positions – IEI Integration PPC-5xxx-9455 v1.00 User Manual
Page 79
Advertising
![background image](/manuals/356362/79/background.png)
PPC-5xxx-9455 Panel PC
Page 61
Figure 4-21: Panel Mounting Clamp Positions
Step 5:
Tighten the screws that pass through the panel mounting clamps until the plastic
caps at the front of all the screws are firmly secured to the panel (Figure 4-22).
Step 0:
Figure 4-22: Tighten the Panel Mounting Clamp Screws
4.7.3 Rack and Cabinet Installation
To mount the PPC-5xxx-9455 into a rack/cabinet, please follow the steps below.
Advertising