Making a cut or mark – Lincoln Electric 718118 Spirit II 400 User Manual

Page 48

Advertising
background image

Section 4: Operation with Manual Gas Console

Spirit II User’s Manual

This information is subject to the controls of the Export Administration Regulations [EAR]. This information shall not be provided to

non-U.S. persons or transferred by any means to any location outside the United States contrary to the requirements of the EAR.

4-4

Making a Cut or Mark

Once the process type, gas types and gas pressures have been set in the MGC; the

correct torch parts (consumables) installed; and the X/Y controller and torch height

control are properly configured; the system is ready to cut or mark.

Release the

OFF Button (turn to the right) on

the MGC. On the main menu, move the

pointer to

On. Press SELECT.

The MGC will purge the gas hoses. The purge

icon ( ) is displayed during this process.

Once purging is complete, the ready icon ( )

is displayed. The system is now ready to cut or

mark.

When the system receives a start signal from

the X/Y controller, the following sequence is

initiated:

• Two second gas preflow

• Impulse start circuit energized

• Pilot arc initiation

• Transferred arc (cutting or marking arc)

established

• Motion output relay energized

When the start signal is removed, the arc is

extinguished and the motion output relay is

deenergized.

Advertising