System installation checklist – Progressive International Electronics RLM User Manual

Page 12

Advertising
background image

Progressive International Electronics

RLM

Version 1.1 / November 98

Page 3

rlminstl.mnl

System Installation

System Installation Checklist

The line monitoring system should be installed in the following order.

1.

Install dispensers and controlling console according to

manufacturer’s specifications. Test dispensers with console for

proper operation. See System Installation Requirements on

following page.

2.

Install Tank Monitor System according to manufacturer’s

specifications. See System Installation Requirements on

following page.

3.

Mount RLM. Refer to RLM General Installation section of this

manual.

4.

Connect system components to specific dispenser box (DBox).

See Pump Specific Installation section for the appropriate brand

of dispenser.

5.

Test RLM with Tester Program. Refer to Diagnostics section of

this manual.

6.

Connect to Tank Monitoring System and test fully integrated

system.

Advertising