Progressive International Electronics RLM User Manual

Page 16

Advertising
background image

Progressive International Electronics

RLM

Version 1.1 / November 98

Page 7

rlminstl.mnl

3.

Referring to Connector/Jumper Layout diagram on the next page,

set all jumpers on the RLM main board according to the specific

application requirements. These settings affect the Tank Monitor

communications parameters such as baud rate, parity, data bits

and device addressing. Also, these jumpers allow the RLM to be

configured for daisy-chaining together using RS485 multi-drop

circuitry. Reference the three diagrams at the end of this

section.

4.

Connect a PC to the installed RLM’s communication cable.

5.

Plug the wall transformer into the dedicated power outlet to apply

power to the RLM system.

6.

Run Tester Program supplied on the system diskette shipped with

the RLM, and perform a preliminary test. Refer to Tester

Program, Preliminary Test in the Diagnostics section of this

manual.

Advertising