System Installation

Pump Specific Installation

RLM-GS for Gilbarco MOC G-SITE Systems

Note all warnings at the beginning of installation section.

If the Gilbarco system employs a MOC G-SITE point of sale system,
special procedures must be followed to ensure a successful installation of
the RLM. First of all, it is important to know from the site survey which
type of controller (C2, 486, Pentium, etc.) the G-SITE is using. Secondly,
the revision number of the software running on the G-SITE is very
important to know.

Confirm that the G-SITE will support the EMC tank monitoring option
which is a component of the BIR (Business Inventory Reconciliation)
interface. The software revision number, along with the MOC type,
indicate the ability of the G-SITE to support this function. If it is
determined that the G-SITE does not have the correct revision software
loaded, a software update is required from an authorized Gilbarco
distributer.

If you have determined that the G-SITE is EMC ready, proceed with the
RLM-GS installation. Otherwise, contact dealer for further assistance.

1.

Locate the G-SITE controller EMC tank monitor port using the
G-SITE installation manual. Connect the RLM-GS to the Gsite
using the 9000 15 0045 cable and the RJ45 adapters (9000 16
0002 and 9000 16 0003) provided by PIE.