Yokogawa RAKD User Manual

Page 19

Advertising
background image

<3. INSTALLATION>

3-5

IM 01R01B30-00E-E 5th edition January 01, 2013 -00

All Rights Reserved. Copyright © 2003, Rota Yokogawa

F8.EPS

F9.EPS

Fig. 3-6

Fig. 3-7

- insert the core ends into the feed through of the splice ring (fig. 3-6). In order to guarantee a clear
assignment of the cores, the individual core feed thorough of the splice ring are numbered (1, 2,…).

- Cut off the projecting core ends. Make sure that
the core ends are flush with the splice ring (5):
they can protrude by up to 3 mm, but must not
be too short.

- Insert the prepared conductor into the QUICKON
contact carrier (4). Turn the conductor with the
splice ring until the coding noses fit exactly into
the corresponding guides (fig. 3-7).

- Close the gland by tightening the union nut. This
presses the core ends into the insultation
displacement terminal blocks, cuts open the core
insulation and creates the electrical contact (IDC
connection system).

Advertising