S12

HARDWARE SETUP PROCEDURE

8.3.7 GEO S12 horizontal array rigidly mounted on a ceiling

Required items

2 x VNI-ABRK (allows rigid ceiling suspension for horizontal arrays)

(N-1) x VNI-ANPL for a N x GEO S12 array (ANPL1 ranges from 0.2° to 3.15°, ANPL2
ranges from 5° to 10°, ANPL3 ranges from 16° to 30°)

N x VNI-CPLA for N x GEO S12 array

Four 12mm diameter screws (not provided)

IMPORTANT

Ensure that the ceiling is strong enough to hold GEO S12 cluster weight and that the
four screws 12mm diameter and corresponding plugs required to fix the “L” brackets
under the ceiling are properly dimensioned.

Procedure

(1) Set all GEO S12 side by side;

(2) Remove the four TORX screws holding connector plates on upper side of all GEO
S12’s;

(3) Remove the connector plates from all Geo S12’s;

(4) Position bottom external plates, angle plates and top external plate from VNI-ANPL
and VNI-CPLA kits to required inter-cabinet angle value between cabinets upper sides;

(5) Apply Loctite 243 or equivalent to shoulder screws from VNI-CPLA kits;

(6) Screw all shoulder screws so that all plates and cabinets are tightened together;