Nexo LS18 User Manual

Page 57

Advertising
background image

GEO

S12

HARDWARE SETUP PROCEDURE

Page 57/103

Lift and position assembly, connect lifting rings to suspension points with sling and
shackle;

Secure assembly with secondary safety steel.

IMPORTANT

The requirements for secondary safety systems vary with territories. However, the
secondary safety steel MUST have a SWL equivalent or greater than that of the rigging
system.

Advertising
This manual is related to the following products: