9 ground stacked ls18 and geo s1210, Required items, Optional gpt-tlb link bar for gpt-xbow – Nexo LS18 User Manual

Page 63

Advertising
background image

GEO

S12

HARDWARE SETUP PROCEDURE

Page 63/103

8.4.9 Ground stacked LS18 and GEO S1210

Required items

M pairs of rigging plates (LST-XBOW) for M x LS18

N Pairs of Rigging Plates (GPT-XBOW) for N x GEO S12;

1 ground stack device (GPT-GSTK);

4xN Quick release pins for N cabinets;

IMPORTANT

- Ground stack device GPT-GSTK is rated for a maximum of:

6xGEO S1210s or 2xLS18s + 4xGEO S1210s or 4xLS18s

in any inter cabinet angle configuration, provided this device is assembled according to
below rules.

- Ground stack device GPT-GSTK must always be installed on a horizontal surface;

- Bottom GEO S12 tilt angle must be limited to +/-10°

- Ensure that public is not allowed within a safety area which radius is equal or higher
than assembly height.

- It is highly recommended to secure the system to a fix point located at the back of the
stack.

Optional GPT-TLB link bar for GPT-XBOW

GPT-XBOWs are delivered with standard link bars which allow both stacked and flown setups.
However, these link bars require perfect alignment of angle setting holes when adding cabinets.

GPT- XBOW STANDARD LINK BAR

To facilitate flying and stacked operation, an optional link bar with oblong holes (GEOS12-TLB, pair of
link bars provided with two 8x20 quick release pin) is available in the GEO S12 accessory range.

GPT-XBOW OPTIONAL GPT-TLB LINK BAR

To install GPT-TLB, remove the standard link as well as nut, screw and washers.

When using GPT-XBOW for stacked setups, insert pins in the two circular holes.

REMOVING STANDARD LINK BAR

INSERTING PINS - STACKED SETUPS

Advertising
This manual is related to the following products: