Nexo LS18 User Manual

Page 43

Advertising
background image

GEO

S12

HARDWARE SETUP PROCEDURE

Page 43/103

(7) Flip the cluster upside down to access connector plates located on the down side;

(8) Repeat all above steps from #2 to #6;

(9) Position the two “U” brackets from VNI-ABRK kits on the outer cabinets next the
angle plates, and tight them to the cabinets using the shoulder screws provided with
these kits (using Loctite 243 or equivalent);

(10) Four screws 12mm diameter (not provided) are required to secure the “U” brackets
under the ceiling;

Advertising
This manual is related to the following products: