6 two geo s12 flown horizontally, Required items, Procedure – Nexo LS18 User Manual

Page 54

Advertising
background image

Page 54/103

GEO

S12

HARDWARE SETUP PROCEDURE

8.4.6 Two GEO S12 flown horizontally

Required items

1 x “U” Bracket for two GEO S12s (GPT-PSBRK)

1 x Lifting Ring (VNT-XHBRK)

Or 1 x Truss hook (VNT-TCBRK)

IMPORTANT

Ensure that suspension point is strong enough to hold two GEO S12s weight.

Procedure

Slide GPT-PSBRK side plates into GEO S12s connecting plate oblong holes;

Lock safety pins into GEO S12s connecting plate;

IMPORTANT

Ensure that safety pins are properly locked into GEO S12s connecting panels.

Adjust inter-cabinet angle and lock to required angle value with 8x20 quick release pins;

Position “U” bracket over these side plates; align centre holes;

Insert adjustment handles, adjust vertical angle and tight the handles to prevent GEO
S12s from rotating around “U” bracket;

Cable suspension:

Connect lifting ring VNT-XHBRK to “U” bracket by inserting 8x45 quick release pin
dedicated holes;

Ensure lifting ring is properly locked to “U” bracket;

Connect assembly to suspension point with sling and shackle (not provided).

Truss suspension

Connect truss hook VNT-TCBRK to “U” bracket by inserting 8x45 quick release pin in
dedicated holes;

Ensure truss hook is properly locked to “U” bracket;

Lift and position assembly, lock hook on truss suspension point and secure with hook
cable.














Advertising
This manual is related to the following products: