Nexo LS18 User Manual

Page 52

Advertising
background image

Page 52/103

GEO

S12

HARDWARE SETUP PROCEDURE

Alternative Procedure

(“Walder” procedure)

Below described procedure required 2 additional 8x20 quick release pins (BLGEOS)

Split the GPT-PSBRK side plates by removing screws and bolt;

Slide GPT-PSBRK lower half-plates into lower GEO S12 connecting plate oblong holes;

Lock safety pins into lower GEO S12 connecting plate;

Position “U” bracket over these lower half plates; align centre holes;

Insert adjustment handles, adjust vertical angle and tight the handles to prevent GEO
S12 from rotating around “U” bracket;

Lift assembly on Wind Up stand or on LS18 with PLSTD pole stand.

Slide GPT-PSBRK upper half-plates into upper GEO S12 connecting plate oblong
holes;

Lock safety pins into upper GEO S12 connecting plate;

Lift upper GEO S12 on top of lower one, and connect them together by inserting 8x20
quick release pins in articulation holes;

Adjust inter-cabinet angle and lock to required angle value with quick release pins.

IMPORTANT

Ensure that safety pins are properly locked into GEO S12 connecting panels.

Advertising
This manual is related to the following products: