Model no. krb1,2,3&4, Pump outside tank option - overall, Installation of submersible pumps – Davey RAINBANK WITH SUBMERSIBLE PUMP User Manual

Page 12

Advertising
background image

6

6

1

2

5

1

2

3

In-tank Option

Model No. KRBS1&2

3

5

6

9

4

7

Above Ground Option

Model No. KRB1,2,3&4

9

4

Mains water supply
900kPa Maximum

1

3/4” BSP Male thread

2

3/4” BSP Male thread

3

Pump Power lead

4

RainBank

®

Power lead

5

Stop valve

Warning:
Do not reconnect with
mains water supply

Important:
All pipework and outlet
fittings from RainBank

®

must

be labelled to AS/NZS 3500

6

Float switch

7

Manual start button

8

Rainwater supply via pump

9

8

8

12

25

puMp outsIDe tank

optIon - oVerall

MoDel no. krb1,2,3&4

InstallatIon oF

subMersIble puMps

1. use teflon tape on the pipe

to pump connection.

2. secure the power cable to the delivery

pipe with cable ties.

3. place pump into tank.

4. Davey recommends the fitting of

floating inlets to submersible pumps

to minimize any possibility of sludge

intake. part number to suit pump

D42a/b is FI-42.

Cable tie

PVC pipe

Union

Float switch

Pump

Handle

!

IMPORTANT

Do not pull on power lead. Fit a

rope to handle for lowering and

raising pump.

6

6

1

2

5

1

2

3

In-tank Option

Model No. KRBS1&2

3

5

6

9

4

7

Above Ground Option

Model No. KRB1,2,3&4

9

4

Mains water supply
900kPa Maximum

1

3/4” BSP Male thread

2

3/4” BSP Male thread

3

Pump Power lead

4

RainBank

®

Power lead

5

Stop valve

Warning:
Do not reconnect with
mains water supply

Important:
All pipework and outlet
fittings from RainBank

®

must

be labelled to AS/NZS 3500

6

Float switch

7

Manual start button

8

Rainwater supply via pump

9

8

8

Advertising
This manual is related to the following products: