2.4.2 PM: Pilot Monitor’s Flame Sensitive Wavelength

The QUASAR M8100PM-EXP uses a single select filter allowing the electronics to amplify the IR
energy of interests over the background IR energy. This allows the Pilot Monitor to achieve high

sensitivity and dynamic range.

2.4.3 FM: Flare Monitor’s Flame Sensitive Wavelength

The QUASAR M8100FM-EXP uses a single select filter allowing the electronics to amplify the IR

energy of interests over the background IR energy. This allows the Flare Monitor to achieve high
sensitivity and dynamic range.

2.5 Quick Installation Procedure

This quick installation procedure may be used as a checklist if you are familiar with the

equipment. For complete instruction and safety precautions, refer to the appropriate sections of

this manual:

Appendix E: Engineering Drawing 613-816, Service Connections

Chapter 3, Mechanical Installation

Chapter 4, Electrical Installation

Chapter 8, Safety Assurances and Precautions

Warning: Service personnel shall be qualified to install and service electrical
equipment designed for areas classified as hazardous. At no time should the cover be
removed unless power is switched off first. When it is necessary to service the

instrument with the power applied, ensure proper safe environmental conditions exist
and that such maintenance is authorized and pursuant to safe conditions. See

Chapter 10, Safety Assurances and Precautions, for more information.

1. Installation Sight Assessment

a. Verify the location is within the instrument’s design capabilities and that the

field of view will yield acceptable performance. Refer to Chapter 3, Mechanical

Installation, for more information.

b. Confirm the instrument’s input power and signal output configuration is as

expected.

2. Mechanical - ensure the correct air requirements are met:

a. View port purge
b. Vortex cooler (if required)

3. Focus the instrument on the target (adjust the lens).
4. Electrical - (Reference: Chapter 10.2, Electrical Service Protection):

a. Connect the instrument power:

i. The power service type is marked on the Terminal Output PC Board;

verify that it corresponds to the service type being installed.

ii. Separate the power wires from the signal wires by routing through

separate conduit ports.

iii. Connect the service power to TB1 on the Terminal Output PC Board.