1 start-up operation checklist, pilot monitor (pm), 1 getting started – LumaSense Technologies M8100SM-EXP User Manual

Page 31

Advertising
background image

E

2

T QUASAR Flare Monitors Operation Manual

Operating the M8100PM-EXP 31

1. Eyepiece Lens with
Reticle

2.

Status Red LED:

Alarm

3.

Status Green LED

4.

AGC Compensation (PM)

5.

System Gain Adjust

6.

Gain/Setpoint Selector

7.

Focus Adjust and Lens

Locking Screw

8.

Objective Lens

9.

Delay Adjust

10.

Set-Point Adjust

11.

Gain/Setpoint

Monitor

12.

Heater Connection

13

. Output PCB

14.

Main Supply

Connector to Electronics

15.

Signal I/O to Electronics

Figure 9: Opto-Electronics Module

5.1 Start-Up Operation Checklist, Pilot Monitor (PM)

Warning: At no time should the cover be removed unless the power is switch-off first.
When it is necessary to service the instrument with the power applied, ensure that

proper safe environmental conditions exist and that such maintenance is authorized
and pursuant to safe conditions.

5.1.1 Getting Started

1. Remove the top cover and sixteen M8 x 1.25 socket head screws.
2. Ensure that the sight path is clear.
3. Ensure that the optics are properly focused on the target (See Sections 3.2, 3.6, and 3.7).
4. Verify that the proper power and signal connections have been made as per Chapter 4,

Electrical Installation.

Caution: Ensure that safe conditions exist before applying power to the instrument.
Allow at least 30 minutes of warm-up time before proceeding.

Advertising
This manual is related to the following products: