8 .3 .5 provers – KROHNE Summit 8800 Vol 3 User Manual
Page 127

127
www.krohne.com
08/2013 - MA SUMMIT 8800 Vol3 R02 en
SUMMIT 8800
COMMUNICATION
08
Timeout
Time to stop connectivity attempts between the devices
Retries
Number of attempts to establish communication before an alarm is given
Stream
Select the stream where the transmitter is installed ( for single device only)
Modbus ID 1..5
Unique Modbus identifiers for the 5 meter streams (only one for single
device)
The actual meters are selected in the stream meter input section (see volume 2):
Figure 173 Modbus master, selection of gas coriolis meter
Each meter has their own set of parameters, so please check the meter for details.
8 .3 .5 Provers
A prover and the streams to be proved may be combined in one Summit. However a prover and
the streams to be proved may also be in separate Summits. In the last case a Modbus link is
needed to connect the prover computer to the stream flow computers. The prover computer will
be master, the stream flow computers will be slaves. See volume 2.
To create the Modbus master, select one of the (gas) prover versions: