9 .8 factory acceptance test check – KROHNE Summit 8800 Vol 3 User Manual
Page 157

157
www.krohne.com
08/2013 - MA SUMMIT 8800 Vol3 R02 en
SUMMIT 8800
GENERAL INFORMATION
09
Figure 210 Calculation code and help
Press help on this page to get the full LUA help, including all Summit additions to the language.
For further details, refer to the internet or contact KROHNE.
9 .8 Factory acceptance test check
Liquid
Gas
Steam
To verify a configuration and to do a regular parameter check it is very useful and more accurate
to simulate the measurements by software instead of the need for hardware signal generators.
Furthermore to check the full range of the calculations, normally these simulated values must
regularly be manually. This is time-consuming and error prone.
The FAT check is designed to do all of this automatically. A list of settings and the time to change
them can be created and in maintenance mode this list can be processed automatically.
This means that all steps (e.g. a day worth of steps) for an FAT can be done without supervision
after which the generated reports can be compared with the expected results.
The configuration of the steps is as follows: