Badger Meter GALAXY User Manual
Page 17

4 Align the optical read head of the IR cable with the
IR port of the TR2 endpoint and tap the Read button
or press ENTER on the keypad
If you need help getting a read, refer to
"Please Wait: Reading" displays on the screen after
tapping the Read button
NOTE:
N
The endpoint cannot be read or
programmed until it has been swiped
with the magnet If the Wakeup GALAXY
screen (Figure 24) displays again, swipe the
endpoint with the magnet, then tap the
Read button again
Figure 26: Reading in progress
The current read is displayed and the endpoint
label displays in green in the lower right corner of
the screen
Figure 27: TR2 with read
Any alerts such as a tamper or leak will also display if they are reported to the endpoint
Programming Manual
Page 17
February 2013