Reading the tr3 endpoint, Reading the tr3 endpoint 9 – Badger Meter GALAXY User Manual
Page 9
Advertising

Reading the TR3 Endpoint
With the TR3 IR tab selected, align the optical read head of
the IR cable with the IR port of the TR3 endpoint and tap the
Read button or press ENTER on the keypad
NOTE:
N
For best results, the optional TR3 programming
bracket can be used to align the IR cable
If you need help getting a read, refer to
Two messages display after tapping the Read button
1 "Please Wait: IR Wakeup in Progress"
2 "Please Wait: IR Read in Progress"
Figure 7: TR3 reading in progress
The current read is displayed and the green arrow indicates
the radio is on
Any alerts such as a tamper or leak will also display if they are
reported to the endpoint
Figure 8: TR3 with read
Programming Manual
Page 9
February 2013
Advertising