Dwyer UXF2 User Manual
Page 29

-
19
-
(3) Make sure the obtained status is as shown in Fig. 3-4.
Fig. 3-4
(4) As shown in Fig. 3-5, apply the frame on the pipe
section subjected to a surface treatment.
Fig. 3-5
(5) Temporarily tighten the first stainless steel belt on the
pipe as shown in Fig. 3-6.
Fig. 3-6
(6) Adjust the frame so as to be in parallel with the pipe,
put the spring fixture to the side of the frame as
shown in Fig. 3-7, and tighten the stainless steel belt
so that the frame will tightly be fitted.
Fig. 3-7
(7) After tightening both stainless steel belts, slide the
spring fixture to the opposite to the frame as shown in
Fig. 3-8.
Fig. 3-8
Note: When removing the frame set to the piping and
set it to a different position, use new stainless
steel belts.
BULLETIN F-70