Installation of the tcm, Electrical connections, 3 installation of the tcm – PNI TCM 5 User Manual

Page 9: 1 electrical connections

Advertising
background image

PNI Sensor Corporation

Doc #1007537 r12

TCM3 & TCM5 User Manual

– Sept 2012

Page 9

3 Installation of the TCM

This section describes how to configure, program, and control the TCM in your host system. To install the
TCM into your system, follow these steps:

Make electrical connections to the TCM

Evaluate the TCM using the included TCM Studio Program

Choose a mounting location

Mechanically mount the TCM

Perform user calibration

Before you install the module, it can be evaluated with the TCM Studio outside of your system. Please
see section 4.1

TCM Studio

.

3.1 Electrical Connections

Included with the TCM Interface Kit is a cable to allow for the unit to be connected to your host system.
On one end of the cable is the connector needed to mate with the TCM3/5. The cable’s wires are color
coded as indicated below.

PNI also has a 6-foot cable with a DB9 connector attached. Please contact PNI Corporation for purchas-
ing information.

TCM Pin Descriptions

Pin

Wire Color

Description

1

Black

Power Ground

2

Gray

NC

3

Green

R2-232 Ground

4

Orange

NC

5

Violet

NC

6

Brown

NC

7

Yellow

TxD

8

Blue

RxD

9

Red

5 VDC


Advertising
This manual is related to the following products: