CALIBRATION

When re-calibration is required (generally every two years), this procedure

should be performed by qualified technicians using appropriate equipment.
Equipment source accuracy of 0.01% or better is required.

The procedure consists of: applying accurate voltage signals, applying

precision mA current and measuring accurate mA currents, among others.
Allow a 30 minute warm-up period before starting this procedure.

This procedure may be aborted by disconnecting power to the controller

before exiting the configuration mode. The existing calibration settings
remain in affect.

Configure Step 9 - Factory Service Operations (9-Fs)

Display

Parameter

Description/Comments

Code

Enter factory service
function code

48

Calibrate instrument

CAL

Voltage and Current
Calibration

yes/no

Calibration of voltage input is done
first.

ANCL

Analog Output
Calibration

yes/no

This parameter will not appear if
analog output option is not installed.

2CAL

Second Analog
Input Calibration

yes/no

This parameter will not appear if
second analog input is not installed.

Voltage Calibration

Connect precision voltage source with an accuracy of 0.01% to terminals

(+) #8 and (-) #10 for voltage calibration.

Display

Parameter

Description/Comments

StP1

0.000 V step

Apply 0.000 V, wait 10 seconds, press PAR.

StP2

1.667 V step

Apply 1.667 V, wait 10 seconds, press PAR.

StP3

3.333 V step

Apply 3.333 V, wait 10 seconds, press PAR.

StP4

5.000 V step

Apply 5.000 V, wait 10 seconds, press PAR.

StP5

6.667 V step

Apply 6.667 V, wait 10 seconds, press PAR.

StP6

8.333 V step

Apply 8.333 V, Wait 10 seconds, press PAR.

StP7

10.000 V step

Apply 10.000 V, wait 10 seconds, press PAR.

StP-

Pause

The controller imposes a 5 sec. delay (Keep
the 10.000 V signal applied). The unit
automatically advances to StPA.

Current Calibration

Connect a precision current source with an accuracy of 0.01% to terminals

(+) #9 and (-) #10 for current calibration when step A appears.

Display

Parameter

Description/Comments

StPA

0.000 mA

Apply 0.000 mA, wait 10 seconds, press PAR.

StPB

20.000 mA

Apply 20.000 mA, wait 10 seconds, press PAR.

The unit automatically advances to analog
output calibration if the option is installed.

Analog Output Calibration (ANCL)

4 to 20 mA

Press PAR until “ANCL” appears in the display. Connect precision

ammeter (0.1% accuracy) to rear terminals (+) #11 and (-) #12.

Display

Parameter

Description/Comments

ANC1

Analog output
4 mA code
value

Observe current reading. If 4.00 mA, press
PAR. If not equal, modify existing code value
using up and down buttons to achieve 4.00
mA. Press PAR.

ANC2

Analog output
20 mA code
value

Observe current reading. If 20.00 mA, Press
PAR. If not equal, modify existing code value
using up and down buttons to achieve 20.00
mA. Press PAR.

0 to 10 VDC

Press PAR until “ANCL” appears in the display. Connect a precision

voltmeter (0.1% accuracy) to rear terminals (+) #11 and (-) #12.

Display

Parameter

Description/Comments

ANC1

Analog output
0 VDC code
value

Observe voltage reading. If 0.00 VDC, press
PAR. If not equal, modify existing code value
using up and down buttons to achieve 0.00
VDC. Press PAR.

ANC2

Analog output
10 VDC code
value

Observe voltage reading. If 10.00 VDC, Press
PAR. If not equal, modify existing code value
using up and down buttons to achieve 10.00
VDC. Press PAR.