Checking the leds – Avaya PARTNER-18D User Manual

Page 25

Advertising
background image

2 Installing Your System

Installing the Control Unit

15

Quick Reference Guide

7

If this is the initial installation for a Release 3.0 system, follow these
additional steps:

a

Check the LEDs to make sure that the processor is on steady green for
at least 15 seconds.

b

Press

f00ss#989

at extension 10

or 11.

c

Press

25327

.

The system resets. You may proceed with the rest of the installation upon
completion of the reset (about 20 seconds).

Checking the LEDs

After you power up your system, check the green lights on the fronts of the
modules:

• If a single light is out, power down the control unit, reseat the module, and

then power up the carrier.

• If multiple lights are out, power down the carrier, reseat either both modules

(2-slot carrier) or the leftmost module that has a light out (5-slot carrier),
and then power up the carrier.

If the lights are still out, see the “Customer Support Document” on the
accompanying compact disc for information about whom you should contact.

If your system has a 1600 DSL module, initialization of the line
and extension ports may take up to 40 seconds. The
initialization of the 1600 DSL module itself may take from 2 to 7
minutes.

Advertising
This manual is related to the following products: