Testing a fuse: continuity – Balboa Water Group BP 50Hz User Manual
Page 23

23
Manufactured under one or more of these patents. U.S. Patents: 5332944, 5361215, 5550753, 5559720, 5,883,459, 6253227, 6282370, 6590188, 6976052, 6965815, 7030343, 7,417, 834 b2,
Canadian Patent: 2342614, Australian patent: 2373248 other patents both foreign and domestic applied for and pending. All material copyright of Balboa Water Group.
42217B
THE PREFERRED WAY TO CHECK FOR FUSE CONTINUITY IS WITH
THE FUSES REMOVED FROM THE CIRCUIT.
TESTING A FUSE: CHECK CONTINUITY
WITH THE FUSE REMOVED
Testing a Fuse: Continuity
A FUSE WITH THE
METER READING “GOOD”
A FUSE WITH THE
METER READING “BAD”
FUSES INSTALLED IN THE SYSTEM
0.3 amp (part number 21581)
3 amp (part number 20600)
10 amp (part number 30122)
30 amp (part number 30136)
NOTE: THERE ARE NO SERVICEABLE PARTS ON THE PCB.