Balboa Water Group BP 50Hz User Manual

Page 66

Advertising
background image

66

Manufactured under one or more of these patents. U.S. Patents: 5332944, 5361215, 5550753, 5559720, 5,883,459, 6253227, 6282370, 6590188, 6976052, 6965815, 7030343, 7,417, 834 b2,

Canadian Patent: 2342614, Australian patent: 2373248 other patents both foreign and domestic applied for and pending. All material copyright of Balboa Water Group.

5/02/13

W

iri

ng Diagr

am - BP2

1MSSH, Par

t Number

: 563

81 (

con

t.)

PART B

BP21MSSH – PN 56381

01-03-13

1

PROGRAMMABLE FILTRATION + POLLING

2-SPEED

2-SPEED

1-SPEED

°C

2

PROGRAMMABLE FILTRATION + POLLING

2-SPEED

1-SPEED

1-SPEED

°C

3

PROGRAMMABLE FILTRATION + POLLING

2-SPEED

NONE

1-SPEED

°C

4

NONE

2-SPEED

2-SPEED

1-SPEED

°C

5

NONE

2-SPEED

1-SPEED

1-SPEED

°C

6

NONE

2-SPEED

NONE

1-SPEED

°C

SETUP #

CIRC PUMP

PUMP 1

PUMP 2

MicroSilk®

TEMP SCALE

PUMP 1 LOW TIMEOUT IS 15 MINUTES.

LOCATION DEVICE

J9

NETZSTROMVERSORGUNG 2-GESCHW.-PUMPE 1 ALIMENTATION POMPE 1 A 2 VITESSES 2-SPEED PUMP 1

J14

NETZSTROMVERSORGUNG 2-GESCHW.-PUMPE 2 ALIMENTATION POMPE 2 A 2 VITESSES 2-SPEED PUMP 2

PUMP 2 LINE 1 CONNECTION

J19 to J57

J15

10V BELEUCHTUNG ECLAIRAGE BAIN HYDRO SPA LIGHT

J21

KREISLAUF PUMPE POMPE DE CIRCULATION CIRC PUMP

J32

OZONGENERATOR GENERATOROZONE OZONE GENERATOR

CIRC AND OZONE LINE 1 CONNECTION

J81 to J55

J33

TV / AV

J40 IR

RECIEVER

J5, J8

AUX PANEL(S) - AX10, AX20, AX30, AX40

A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

SWITCHBANK S1 OFF

SWITCHBANK S1 ON

SWITCHBANK S1 OFF

SWITCHBANK S1 ON

A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

230V 3þ / 3x16A

230V 3þ

3x16A

GRN

BLU

1 BRN

2 BRN

3 BRN

PUMP 2 IS 2-SPEED IN

SETUPS 1 & 4

PUMP 2 IS 1-SPEED IN

SETUPS 2 & 5

PUMP 2 IS NOT USED IN

SETUPS 3 & 6

SINGLE SERVICE

230V 1þ / 1x32A,

THREE-SERVICE

230V 1þ / 3x16A

230V 1þ

1x32A

TEST MODE OFF

DON’T ADD 1 HS PUMP W/HTR

DON’T ADD 2 HS PUMPS W/HTR

DON’T ADD 4 HS PUMPS W/HTR

SPECIAL AMPERAGE RULE A*

STORE SETTINGS**

NOT ASSIGNED

NOT ASSIGNED

NOT ASSIGNED

NOT ASSIGNED

TEST MODE ON

ADD 1 HS PUMP WITH HEAT

ADD 2 HS PUMPS WITH HEAT

ADD 4 HS PUMPS WITH HEAT

SPECIAL AMPERAGE RULE B*

MEMORY RESET**

NOT ASSIGNED

NOT ASSIGNED

NOT ASSIGNED

NOT ASSIGNED

**SWITCH #

6

SHOULD BE SET TO OFF UPON FINAL INSTALLATION.

**SWITCH #

6

SHOULD BE SET TO OFF UPON FINAL INSTALLATION.

TEST MODE OFF

DON’T ADD 1 HS PUMP W/HTR

DON’T ADD 2 HS PUMPS W/HTR

DON’T ADD 4 HS PUMPS W/HTR

SPECIAL AMPERAGE RULE A*

STORE SETTINGS**

NOT ASSIGNED

NOT ASSIGNED

NOT ASSIGNED

NOT ASSIGNED

TEST MODE ON

ADD 1 HS PUMP WITH HEAT

ADD 2 HS PUMPS WITH HEAT

ADD 4 HS PUMPS WITH HEAT

SPECIAL AMPERAGE RULE B*

MEMORY RESET**

NOT ASSIGNED

NOT ASSIGNED

NOT ASSIGNED

NOT ASSIGNED

SYSTEM WILL BE IN SETUP #1

UNLESS MARKED OTHERWISE

INSTEAD OF SETUP #1,

THIS SYSTEM IS CONFIGURED IN SETUP #:

FOR SUPPLY CONNECTIONS,

USE CONDUCTORS SIZED ON THE

BASIS OF 60°C AMPACITY BUT

RATED MINIMUM OF 90°C.

TORQUE RANGE FOR MAIN TERMINAL BLOCK (TB1): 27-30 IN. LBS. (31.1-34.5 kg cm)

USE COPPER CONDUCTORS ONLY. EMPLOYER UNIQUEMENT DES CONDUCTEURS DE CUIVRE.

TB1

1

2

3

4

4

3

2

1

J78

J45

J79

J72

J42

J3

J37

J4

J1

J61

J47

J54

J77

J75

J36

J60

J53

J58

J41

J12

J88

J62

J51

J52

J98

J38

J6

W1-XP332

XP332

J20

J18

J46

Advertising