Goulds Pumps 7200CB - IOM User Manual

Page 50

Advertising
background image

Commissioning, Startup, Operation, and Shutdown

NOTICE:
This procedure must be done only after the pump is properly aligned with the driver on the
baseplate.

1. Install pin (394) into casing.
2. Place block (441) on pedestal located on baseplate and align with pin (394) in casing.
3. Secure block with lockwasher (438E) and capscrew (370F) to baseplate.

48

Model 7200CB, API Type BB5 Barrel Multistage / ISO 13709 2nd Edition / API 610 11th Edition Installation, Operation, and

Maintenance Manual

Advertising