Goulds Pumps 7200CB - IOM User Manual

Page 58

Advertising
background image

Maintenance

12. Install rail supports (850L) to assembly rail (850H). Using jack screws (851E) and nuts

(852), adjust as necessary to level with ground and baseplate. Tighten nuts (852) and bolts
(851F).

13. Install rail stop (850M) and tighten bolt (851G) and nut (852A).
Assemble cart for head.
14. Install cart bracket (850G) to cart (850F) and tighten bolts (851H) with washers (853C).

15. Install casters (854A) to cart and tighten bolts (851J).
Assemble cart to head.

56

Model 7200CB, API Type BB5 Barrel Multistage / ISO 13709 2nd Edition / API 610 11th Edition Installation, Operation, and

Maintenance Manual

Advertising