Confirm the seal chamber runout – Goulds Pumps 7200CB - IOM User Manual

Page 98

Advertising
background image

Maintenance

21. Install sleeve locating ring (361F).

22. Install locating ring retainer (253). Tighten locating ring retainer bolts (371B).
23. Install belleville washer (354A) and the head gasket (351) onto head (184). Apply a liberal

amount of high vacuum grease to washer and gasket so it doesn’t fall out when assembling
the head.

24. Insert eyebolts (not supplied) in the pre-drilled threaded holes in the top outside perimeter

of the head (184).

WARNING:
Use the eyebolts to lift only the head. They will not support the weight of the entire bundle.

25. Assemble head (184) onto the discharge cover (150B). Apply an anti-seize compound to

the register fit where indicated by the arrow.

Confirm the seal chamber runout

The bearing housings (134 and 134A) are doweled to the head (184) and suction cover (182)
during the original build. However, in order to assure the correct running position of the shaft,
use this procedure in order to confirm the seal chamber runout before you install the cartridge
mechanical seals:

96

Model 7200CB, API Type BB5 Barrel Multistage / ISO 13709 2nd Edition / API 610 11th Edition Installation, Operation, and

Maintenance Manual

Advertising