Boiler installation – Bosch 25/32kW User Manual

Page 21

Advertising
background image

BOILER INSTALLATION

Note: The cabinet is not load bearing it
only provides weather protection for the
boiler inside.

1

Mark position of the 100mm services

duct on the exterior wall and make a hole
through.

2

Remove the key for the door fastners

from its transport position in the left hand
side panel flue outlet aperture.

Undo the screws at the bottom of

the front panel (using the key provided)
and remove the screws from the rear
panel pulling both panels out and down
to remove. Store safely away from the
installation point.

3

Remove the screws from the top panel

and lift up to remove, store safely away
from the installation point.

4

Slide the pressure gauge up out of its

bracket and carefully rest on top of the
heat exchanger taking care not to snag or
kink the capillary.

5

Remove the screws securing the control

box to the side panels and carefully rest
the control box on top of the heat
exchanger taking care not to snag or kink
the capillaries.

6

Remove the screws securing the side

panels to the base panel and lift the side
panels off complete with the rear support
bar (shaded grey) and carefully stand the

panels away from the installation point.

7

Loosen the flexable air duct clamp (A)

and remove the air duct from the burner.

Depress the locking ears to unplug the

burner lead (B) from the control box (C).

Unscrew the burner retainers (D), then

withdraw the burner (E) from the boiler and
store safely away from the installation point.

8

Remove the screws securing the base

panel to the transit pallet and lift the boiler
off the pallet and into its installation
position taking care not to scrape the
base panel across the hard standing. Do
not attempt to lift and position the
boiler on your own. Do not use the
copper pipes to move the boiler.

Fasten the base to the hard standing

using the holes provided. Care should be
taken to ensure that the base is level.

9

Refit the side panels and rear support

bar and screw the side panels to the
baseplate and boiler.

Refit the control box and pressure

gauge taking care not to kink the
capillary tubes.

Measure the 100mmØ services duct to

give at least 10mm inside the casing and
to finish flush with the interior wall
surface, cut to size and fit the duct. Fit the
100mm sealing ring where the duct
enters the casing and seal the joint to the
exterior wall and inside the cabinet with a
suitable sealant.

BOILER INSTALLATION

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389b (09/07)

20

IN

ST

AL

LA

TI

O

N

2

2

3

4

5

6

7

8

7

A

B

C

D

E

WARNING: THIS APPLIANCE IS SERVICED AND REPAIRED EXTERNALLY.

EXTERNAL EQUIPMENT OPERATED AT 230V SHOULD NOT BE INSTALLED, SERVICED OR
REPAIRED UNDER ADVERSE WEATHER CONDITIONS.

THIS APPLIANCE IS INSTALLED AND SERVICED EXTERNALLY TO THE PROPERTY, BUT
THE ENGINEER MUST HAVE ACCESS TO THE INSIDE OF THE PROPERTY WHEN
INSTALLING OR SERVICING THE APPLIANCE.