Front front, Combustion chamber – Bosch 25/32kW User Manual

Page 23

Advertising
background image

COMBUSTION CHAMBER

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389b (09/07)

22

IN

ST

AL

LA

TI

O

N

Combustion chamber:
1

Release retaining nuts and washers (B).

Remove combustion chamber access

door (A).

2

Ensure the baffles (C) and baffle retainer

(D) are correctly fitted for the boiler output

as shown in the plan views opposite.

3

Refit combustion chamber door (A).

Secure with nuts and washers (B) and

tighten until the door is firmly secured, do
not over tighten the nuts.

4

Unscrew screws (E) and remove flue

manifold access cover (F).

5

Check that all the baffles (G) and baffle

retainer (H) or ( J ) are correctly fitted to the
secondary heat exchanger.

COMBUSTION CHAMBER

H

F

2

E

4

G

5

A

B

1

3

D

C

12/18 & 18/25kW

Plan sectional view

D

C

25/32kW

Plan sectional view

J

Hook the
retainer ( J )
over the
end two
baffles

or

FRONT FRONT

Advertising
This manual is related to the following products: