Finishing commissioning - appliance – Bosch 25/32kW User Manual

Page 37

Advertising
background image

31

FINISHING COMMISSIONING -

APPLIANCE

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389b (09/07)

36

C

O

MMI

S

S

IO

N

IN

G

FINISHING COMMISSIONING -

APPLIANCE

1

Refit the top panel and press down to

compress the seal when fitting the
securing screws (A).

2

Push the front panel up behind the top

panel and push in at the base to secure
the screws (B) with the tool provided.

Always apply pressure at the edges of the

panels when securing to avoid accidental
damage.

Handover:

Complete the guarantee registration card,

combustion record (page 49) and a CD11 or
an equivalent commissioning form.

Set up the controls and show the user how

to operate all the controls shown in the User
Guide, and all system controls.

Where applicable, instruct the customer how

to repressurise the system.

If the appliance is unused and exposed to

freezing conditions, shut off all the mains
supplies and drain the system and boiler to
prevent damage to the system and boiler.

NOTE: Release drain point (K) to drain the

secondary heat exchanger.

K

A

A

B

B

C

2

1

Advertising
This manual is related to the following products: