Starting the appliance, Co mmi s s io n in g – Bosch 25/32kW User Manual

Page 35

Advertising
background image

STARTING THE APPLIANCE

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389b (09/07)

34

C

O

MMI

S

S

IO

N

IN

G

GREENSTAR HEATSLAVE EXTERNAL

max

flue

reset

boiler

reset

max

lockout

on

service

GREENSTAR HEATSLAVE EXTERNAL

max

flue

reset

boiler

reset

max

lockout

on

service

GREENSTAR HEATSLAVE EXTERNAL

max

flue

reset

boiler

reset

max

lockout

on

service

GREENSTAR HEATSLAVE EXTERNAL

max

flue

reset

boiler

reset

max

lockout

on

service

2

1

3

4

E

D

C

D

C

D

C

E

E

E

STARTING THE APPLIANCE

Central heating:
1

Open all radiator valves.

Set room thermostat to maximum.

Set programmer to ON for CH.
Turn the DHW thermostat control (C) fully

anti-clockwise.

Turn the CH thermostat control (D) to max.

The burner should be ON with the circulating
pump. The diverter valve (E) should open to
port B for CH.

Ensure all radiators are heating up evenly

and balance the system to the temperature
difference required across the heating flow
and return relevant to the heating load.

2

Set the room thermostat to minimum.

The burner and circulating pump should be
off. The diverter valve (E) should return to
port A for DHW (default).

Domestic hot water & central heating:
3

Set the room thermostat to maximum.

Set the programmer to ON for DHW & CH.
Turn the DHW thermostat control (C) fully

anti-clockwise.

Set the CH thermostat control (D) to max.

The burner should be ON with the circulating
pump. The diverter valve (E) should open to
port B for CH.

4

Set the DHW thermostat control (C) to max.

The diverter valve (E) should move to port A
and divert the flow to the Heatslave tank.

Advertising
This manual is related to the following products: