c. If furnace is installed to obtain return air is taken directly

from hallway or space adjacent to furnace, all air for
combustion must come from outdoors.

2. Air from outside the structure requires 1 of the following

methods:
a. If combustion air is taken from outdoors through 2

vertical ducts, the openings and ducts MUST have at
least 1 sq in. of free area per 4000 Btuh of total input for
all equipment within the confined space. (See Fig. 4 and
Table 2.)

b. If combustion air is taken from outdoors through 2

horizontal ducts, the openings and ducts MUST have at
least 1 sq in. of free area per 2000 Btuh of total input for
all equipment within the confined space. (See Fig. 4 and
Table 2.)

c. If combustion air is taken from outdoors through a single

opening or duct (horizontal or vertical) commencing
within 12 in. of the top of the confined space, opening
and duct MUST have at least 1 sq in. of free area per
3000 Btuh of the total input for all equipment within the
confined space and not less than the sum of the areas of
all vent connectors in the confined space. (See Fig. 4 and
Table 2.) Equipment clearances to the structure shall be
at least 1 in. from the sides and back and 6 in. from the
front of the appliances.

When ducts are used, they must be of the same cross-sectional area

as the free area of the openings to which they connect. The

minimum dimension of ducts must not be less than 3 in. (See Fig.

4.)

III. SUPPLY-AIR PLENUM INSTALLATION (DOWN-

FLOW)

A. Downflow Installation
NOTE:
This furnace is approved for use on combustible flooring

when

manufacturer’s

accessory

floor

base

Part

No.

KGASB0201ALL is used. Manufacturer’s accessory floor base is

not required when this furnace is installed on manufacturer’s Coil

Assembly Part No. CD5 or CK5, or Coil Box Part No. KCAKC is

used.

1. Determine application being installed from Table 3.

2. Construct hole in floor per dimensions specified in Table 3

and Fig. 5.

3. Construct plenum to dimensions specified in Table 3.

4. If downflow subbase (KGASB) is used, install as shown in

Fig. 6.

If coil assembly CD5, CK5, or Coil Box KCAKC is used,

install as shown in Fig. 7.

B. Installation On Combustible Floor

1. Cut and frame hole in floor per dimensions in Installation

Instructions packaged with downflow subbase.

2. When completed, downflow subbase, plenum, and furnace

(or coil casing when used) should be installed as shown in

Fig. 6.

Fig. 3—Confined Space: Air for Combustion and Ventilation

from an Unconfined Space

A93387

RETURN

AIR

6″ MIN

(FRONT)

SUPPLY AIR

VENT THROUGH ROOF

(CATEGORY I)

1 SQ IN.

PER 1000

BTUH* IN DOOR

OR WALL

12″ MAX

1 SQ IN.

PER 1000

BTUH* IN DOOR

OR WALL

12″ MAX

INTERIOR

HEATED

SPACE

* Minimum opening size is 100 sq in. with

minimum dimensions of 3 in.

Minimum of 3 in. when type B-1 vent is used.

UNCONFINED

SPACE

Fig. 4—Confined Space: Air for Combustion and Ventilation

from Outdoors

A93388

DUCTS TO

OUTDOORS

1 SQ IN.

PER 4000

BTUH

*

RETURN

AIR

VENT

THROUGH

ROOF

(CATEGORY I)

D

B

A

C

E

1 SQ IN.

PER 4000

BTUH

DUCT

TO

OUTDOORS

SUPPLY AIR

1 SQ IN.

PER 2000

BTUH*

DUCTS

TO

OUTSIDE

12″ MAX

12″ MAX

CONFINED

SPACE

12″

MAX

12″

MAX

1 SQ IN.

PER 4000

BTUH

*

OUTDOORS

1 SQ IN.

PER 4000

BTUH

*

1 SQ IN.

PER 2000

BTUH*

12″ MAX

Use any of the following

combinations of openings:

A & B C & D D & E F & G

NOTE:

*Minimum dimensions of 3 in.

F

G

—5—