A terminal block (EAC-1 [hot] and EAC-2 [neutral]) is

provided for EAC connection. (See Fig. 10.) The terminals

are energized with 115v, 1-amp maximum during blower

motor operation.

2. Humidifier (HUM)

Screw terminals (HUM-1 and C

OM

) are provided for 24-v

humidifier connection. The terminals are energized with

24v, 0.5-amp maximum when the gas valve is energized.

VII. VENTING
Refer to National or Local Installation Code such as; National Fuel

Gas Code NFPA No. 54-1996/Z223.1-1996, or the Canadian

Installation Code, CAN B149.1- and .2-M95, for proper vent

sizing and installation requirements. Use enclosed Venting Tables

for Category I Fan-Assisted Furnaces for quick, easy reference.

The horizontal portion of the venting system shall maintain a

minimum of 1/4-in. upward slope per linear ft, and it shall be

rigidly supported every 5 ft or less with hangers or straps to ensure

that there will be no movement after installation.

VIII. START-UP, ADJUSTMENT, AND SAFETY CHECK

A. General
The furnace must have a 115-v power supply properly connected

and grounded. Correct polarity must be maintained to enable gas

heating operation.

Fig. 11—Heating and Cooling Application Wiring Diagram With 1-Stage Thermostat and Condensing Unit

A97443

115-V FUSED

DISCONNECT

SWITCH

(WHEN REQUIRED)

JUNCTION

BOX

CONTROL

BOX

24-V

TERMINAL

BLOCK

TWO-WIRE

HEATING-

ONLY

FIVE

WIRE

1-STAGE THERMOSTAT TERMINALS

FIELD-SUPPLIED

FUSED DISCONNECT

CONDENSING

UNIT

FURNACE

COM

R

W

Y

R

G

C

GND

GND

FIELD 24-V WIRING

FIELD 115-, 208/230-, 460-V WIRING

FACTORY 24-V WIRING

FACTORY 115-V WIRING

208/230- OR

460-V

THREE

PHASE

208/230-V

SINGLE

PHASE

WHT

BLK

WHT

BLK

W/W1

W2

Y/Y2

G

NOTES:

1. Connect Y-terminal as shown for proper operation.

2. Some thermostats require a "C" terminal connection as shown.

3. If any of the original wire, as supplied, must be replaced,

use same type or equivalent wire.

Fig. 12—Heating and Cooling Application Diagram With 2-Stage Thermostat and Condensing Unit

A97444

115-V FUSED

DISCONNECT

SWITCH

(WHEN REQUIRED)

JUNCTION

BOX

CONTROL

BOX

24-V

TERMINAL

BLOCK

THREE-WIRE

HEATING-

ONLY

SEVEN

WIRE

2-STAGE THERMOSTAT TERMINALS

FIELD-SUPPLIED

FUSED DISCONNECT

2-SPEED

CONDENSING

UNIT

FURNACE

G

R

W2

Y2

G

Y1

C

GND

GND

FIELD 24-V WIRING

FIELD 115-, 208/230-, 460-V WIRING

FACTORY 24-V WIRING

FACTORY 115-V WIRING

208/230- OR

460-V

THREE

PHASE

208/230-V

SINGLE

PHASE

Y2

Y1

C

WHT

BLK

WHT

BLK

W1

R

W2

COM

W/W1

Y/Y2

NOTES:

1. Connect Y-terminal as shown for proper operation.

2. Some thermostats require a "C" terminal connection as shown.

3. If any of the original wire, as supplied, must be replaced,

use same type or equivalent wire.

—9—