Preparation to vehicle – ARB 3421520 User Manual

Page 13

Advertising
background image

Last Rev Date: 14/10/2010

Page 13 of 22

Fitting instructions# 3787836

Copyright © 2005 by ARB Corporation Limited. All rights reserved, this document must not be reproduced without the express authority of ARB Corporation Ltd

PREPARATION TO VEHICLE

46. Fit impact absorbers to chassis ends using

fine thread M10 x 1.25P x 30 bolt and
washer sets supplied, note that the brackets
are handed, slide them towards the centre of
the vehicle on the adjustment slots do not
do up tight


47. Fit M12 bolt, washer and flange nut sets to

top and bottom positions as shown. Insert
M12 flat packing washer between the rear
face of the impact absorber flange and the
front face of the side brace as shown, but do
not do up tight. If necessary grind a
small flat on the side of the washer to
clear lower bolt.

48. Once all bolts are in place nip up the bolts in

the side brace.

49. Then tighten to full torque the bolts of impact

absorbers to chassis flange, starting with
the two inner first
then moving outboard to
vertical rows of 5 bolts on outer flange
position. Now, tension up side brace bolts
to full torque

NOTE: When fitted, if bull bar requires
sideways adjustment to align with vehicle, the
bolts of the mount to chassis will need to be
loosened, adjustment made then re-tensioned.
This is best done before angular brace straps
are fitted and pinned.

50. Modify the clamp plates for the power

steering pipes by cutting off the flange as
shown then drilling a Dia 8.5 hole 8mm from
the bend as shown

Packer washers
top and bottom
bolt locations

Advertising